Thursday, March 1, 2012

Battery re-installation


After a two months of research and design.  Careful consideration has been put into the BMS system and wiring of the unit and and batteries.  We top balanced the 48 cells and let them stay wired in parallel over the last two months.  Now we are prepared to re-install the batteries and label them for the wiring of the Orion BMS.  We cleaned each cell, labelled them and installed them back into the battery boxes in the correct orientation.  Our next step is to carefully wire the harnesses for the BMS.

No comments:

Post a Comment